On this page
The direct answer
Every downspout should discharge at least 4 to 6 feet from the foundation, onto ground that slopes away, and the water should not be able to run back. On clay soil and on lots sloping toward the house, take it further, or into a pipe that drains to daylight.
Why it matters more on red clay
The Piedmont's signature soil is the Cecil series, North Carolina's state soil, covering about 1.6 million acres, roughly 5% of the state. In its natural state it has a sandy loam surface over a red clay subsoil dominated by kaolinite, and the USDA describes it as well drained, with medium runoff.
Around houses, though, it is rarely natural. Building strips and compacts the topsoil, and erosion over the years has exposed the red subsoil in many yards. Compacted clay takes water in slowly. A downspout dumping a whole roof plane's worth of storm water beside the wall saturates the ground there for hours.
Results you may see:
- red splash on brick and siding;
- washed-out beds and exposed footing;
- damp or musty crawl spaces;
- puddles that last long after rain.
How much water we are talking about
A rough rule: an inch of rain on 1,000 square feet of roof is about 600 gallons. High Point's normal is 48.27 inches a year. A typical house roof sheds tens of thousands of gallons a year, and much of it arrives in short summer storms.
Options, simplest first
| Option | Good for | Watch out for |
|---|---|---|
| Splash block | Lots sloping away | Must be angled away and on firm ground |
| Solid extension, 4 to 10 ft | Most houses | Mowing and paths; use hinged types |
| Flexible extension | Temporary, tight spots | Crushes, clogs |
| Buried pipe to pop-up emitter | Tidy lawns | Clogs with silt; needs slope and a clean-out |
| Buried pipe to daylight | Sloping lots | Outlet must stay clear |
| Rain barrel | Gardens | Overflow must lead away; drain before freezes |
Grading
The ground within 10 feet of the foundation should slope away. Many older yards have settled toward the house, or beds have been built up against the wall. Regrading with soil, not mulch, is often part of the fix.
Stormwater in High Point
The City of High Point bills a stormwater fee based on hard surfaces, including roofs. Residential customers are charged for an average of 2,588 square feet, one equivalent residential unit, at $5 a month. The city maintains stormwater systems within the public right-of-way; once runoff leaves it, the property owner is responsible for drainage on their land.
Sending roof water onto lawn and planted areas, rather than straight onto driveways, helps it soak in and reduces runoff.
Checking your own
After the next good rain, walk the house:
- Is water leaving every downspout?
- Where does it go?
- Does any run back toward the wall?
- Are there washed-out channels or lingering puddles?
Fixes are usually inexpensive. See downspouts and downspout repair.
When to call someone else
Persistent water in a basement or crawl space, cracks in foundation walls or settling floors call for a drainage or foundation specialist, not just a gutter contractor. Fixing the downspouts is still a sensible first step.
Neighbors and runoff
Re-routing downspouts changes where water goes. Before sending water toward a property line, a sidewalk or a neighbor's yard, think about where it will end up. Disputes over runoff are common on sloping streets. If in doubt, talk to the city or town.
How much water each downspout handles
An inch of rain on 1,000 square feet of roof is about 83 cubic feet, roughly 620 gallons. If four downspouts share a 2,000-square-foot roof, each one sends out about 310 gallons per inch of rain. In a short summer burst at High Point's NOAA Atlas 14 10-year, 5-minute intensity of 6.97 inches per hour, that water arrives in minutes, far faster than compacted clay can absorb it.
Drainage options in more detail
| Option | How it works | Best for | Limits |
|---|---|---|---|
| Splash block | Concrete or plastic pad spreads flow | Lots sloping away | Must sit on a slope away from the wall |
| Solid extension | Carries water 4 to 10 ft | Most homes | Mowing; use hinged types |
| Buried pipe to pop-up emitter | Solid pipe to a lawn outlet | Tidy lawns | Needs consistent slope, clean-out |
| Buried pipe to daylight | Pipe to a lower part of the lot | Sloping lots | Outlet must stay open |
| Dry well | Underground chamber lets water soak in | Sandy soils | Clay soils absorb slowly |
| Rain garden | Planted shallow basin | Gardens with space | Must be away from the foundation |
| Rain barrel or cistern | Stores water for reuse | Gardens | Overflow must be led away |
Before you dig
Any buried drain means digging. North Carolina requires three full working days' notice to NC811 before digging so utilities can mark lines, and locate marks are valid for 28 calendar days.